Site Overview

PharmaCorp Building 7

PharmaCorp Industries

Pharmaceutical
4200 Industrial Blvd, Research Triangle Park, NC 27709
Maria Chen
maria.chen@pharmacorp.example.com
20 tracked assets
Last data sync: March 15, 2026

Total Equipment

20

Avg Condition

76

Critical Items

0

Compliance Overdue

1

Capital Backlog

$495K

Equipment Condition Distribution

10Good (80-100): 10
6Fair (60-79): 6
3Poor (40-59): 3
Critical (<40): 1
Good (80-100)10
Fair (60-79)6
Poor (40-59)3
Critical (<40)1

Criticality Breakdown

Critical
8
High
9
Medium
3
Low
0

Top Risks

Recent Maintenance Activity

WO-2026-0030V-401inspection

API 653 tank inspection — V-401

Aug 1, 2026
WO-2026-0025P-101preventive

Semi-annual vibration analysis — P-101

May 20, 2026
WO-2026-0026P-102preventive

Semi-annual vibration analysis — P-102

May 20, 2026
WO-2026-0028C-501preventive

Annual compressor service — C-501. Oil analysis, filter replacement, valve over…

Apr 20, 2026
WO-2026-0022R-201inspection

Annual internal inspection of R-201 glass lining

Apr 1, 2026

Upcoming Compliance Deadlines

OSHA PSM 29 CFR 1910.119Overdue

Mechanical integrity inspection — P-401 solvent recovery pump

Due Oct 10, 2025157d overdue
FDA 21 CFR Part 211.65Due Soon

WFI system qualification — HX-401 heat exchanger capacity verification post tube plugging

Due Apr 30, 202645d remaining
OSHA 29 CFR 1910.147Due Soon

Lockout/tagout (LOTO) program annual review — verify energy control procedures for all equipment

Due May 30, 202675d remaining